Call 08048980649 84% Response Rate

Send Email

Cleaning System Equipment And Accessories

Cleanliness Cabinet has been specifically developed For assesses the cleanliness level of components or manufactured parts by flushing them out,
simulating their functional operation under turbulent flow conditions. This is accomplished by passing a filtered, low viscosity fluid through
the component or finished part under turbulent flow conditions to flush contaminants from surfaces and transport them to a test membrane for subsequent analysis

Integrated Test System
  • Integrated Test System
  • Integrated Test System
  • Integrated Test System
  • Integrated Test System
  • Integrated Test System
  • Integrated Test System
  • Integrated Test System
  • Integrated Test System
  • Integrated Test System

Integrated Test System

Product Price: Rs 85,000 / UnitGet Best Price

Minimum Order Quantity: 1 Unit

Product Brochure

Product Details:
Service LocationAll over India
Usage/ApplicationContainer Closure Integrity Testing (CCIT)
MaterialStainless Steel
Capacity5 ltr - 50 ltr
Voltage230VAC pump supply
FinishingElectroplating
10kg12inch x15inch
Country of OriginMade in India

Container Closure Integrity Testing (CCIT), commonly referred to as leak detection, is a non-destructive packaging inspection system to maintain an aseptic barrier against potential contaminants.Testing MethodsThe deterministic methods include the following:Electrical Conductivity and Capacitance Test (HVLD)Laser-based Gas Headspace Analysis.Mass Extraction.Pressure Decay.Tracer Gas (vacuum mode)Vacuum/ pressure Decay.
*Why Container Closure Testing is important:
CCIT detects defects that demonstrate breach of the container and/or closure system.
-Patient and consumer health and safety is the principal reason why testing methods are put into place. Product sterility and consumer safety begins at the product development phase by evaluating the suitability of primary packaging in its ability to offer a sterile barrier thanks to its container closure system which should not result in contamination or leaks of the drug or product.
Other than the leak test method and positive and negative sampling, which should be sufficient enough to provide adequate assurance of package integrity (USP <1207.1>), the criteria for acceptance must also be determined and accordingly all negative controls should pass while all positives must fail.



Additional Information:

  • Item Code: CCIT_5
  • Production Capacity: 30 pic per month
  • Delivery Time: Customized (According Tube Size) 2-3 week
  • Packaging Details: 1)Container Closure Integrity Testing (CCIT) Syestem 2)Test Tube Rack 3)Oil Free Vacuum Pressure Pump 4)Vacuum / Pressure Regulator set 5)Tubing Set 6)Tube Guard Set (Pkt/ 20Pic) 7)Filter Set (Optional)
Get Best QuoteRequest A Callback

EXPLORE MORE CATEGORIES

Contact Us
 
Thank youYour Enquiry has been sent successfully.
© A One Engineering Works. All Rights Reserved (Terms of Use)Developed and managed by IndiaMART InterMESH Ltd.